The four corner posts and the rebar and wire mesh for the pier.
Jena's hand print in the SE corner.
The pier anchor and foot is poured. About 1 cubic meter total,
The view SE with the flock in the back.
Next day the joists in hangers.
First floor plank.
Jena's hand now set in man-made stone.
Hurricane brackets for the studs.
Floor done up to the pier and the first horizontal strip for the sheeting.
We like the look.
No comments:
Post a Comment