Continued work - Floor joists and planked floor
The four corner posts and the rebar and wire mesh for the pier.

Jena's hand print in the SE corner.

The pier anchor and foot is poured. About 1 cubic meter total,

The view SE with the flock in the back.

Next day the joists in hangers.

First floor plank.

Jena's hand now set in man-made stone.


Hurricane brackets for the studs.

Floor done up to the pier and the first horizontal strip for the sheeting.

We like the look.